Instead of PQ-FMEA+
Reviewing PQ-FMEA+ costs? Own your failure review system.
We build your version around your engineering review, map your PQ-FMEA+ export and run it for you. Your engineers keep control of ratings, priorities and acceptance.
PQ-FMEA+ lists €837 net per month on a twelve-month subscription, €10,044 for the year. Paying annually is €7,536 net. Perpetual licences are also available. Compare your actual licence and payment terms.
- check_circleYour data in a database you own
- check_circleOpen source, no lock-in
- check_circleBuilt and run by Enterprise DNA
What the licence pays for
An analysis is more than its annual subscription
PQ-FMEA+ includes specialist analysis and document tools. Choose the review work you want to own and agree the engineering requirements before switching.
A yearly commitment
The monthly-payment subscription totals €10,044 net over twelve months. The lower annual-payment option is €7,536 net.
A licensed location
The public subscription covers unlimited workstations at one company location. Corporate and multi-location terms are quoted separately.
Updates and support
Subscription plans include updates and technical support. Perpetual licensing is a separate option, so check what your current agreement already gives you.
Failure analysis structure
The software connects failure analysis with control plans and process flow. Your owned version can focus on the failure chains and review evidence your team uses.
Action follow-up
PQ-FMEA+ provides employee task lists. Bring the due dates, completion evidence and independent checks into your own weekly review.
Documents and revisions
PQ-FMEA+ exports analysis records and keeps revision history. Your version retains the original export beside the records your engineers review.
Your working records, connected
Own the review that keeps the analysis useful
ENGINEERING ROUND
See where review is missing
Bring recorded priority, severity and current review evidence into the same conversation.
- check Show high-severity failures separately
- check Keep missing ratings visible
- check Record the methodology behind each priority
- check Find failures with no review of the latest version
ACTION EVIDENCE
Separate done from checked
An action needs completion evidence and a different named reviewer before it is marked verified.
- check List overdue work by owner
- check Record the test or document behind completion
- check Record an independent verification reference
- check Flag evidence tied to an older failure version
CONTROL PLANS
Keep controls tied to the failure
A change leaves the old control visible and identifies where a fresh link is needed.
- check Record the characteristic and check method
- check Keep the frequency and reaction plan together
- check Name the person responsible
- check Show controls that cover an earlier failure version
SOURCE AND HISTORY
Keep the evidence behind a change
Retain the original workbook and source row values while your own review history grows.
- check Reconcile the imported failure count
- check Keep unmapped values as source evidence
- check Read earlier and current values in the change history
- check Prepare branded analysis and action working papers
Make it yours
Design your own PQ-FMEA+ replacement
Everything starts from the open-source base. Then it gets your name, the parts you run, your rules and your data from PQ-FMEA+. Try it here, and we build the real one.
2. What it runs
3. Make it fit
4. Your colour
Answered from your own database
Good morning. Here is what needs you today.
We build it from the open-source base, bring your PQ-FMEA+ data across and run it for you.
What it looks like
Ask it like you would ask a colleague
Real answers from the demo data that ships with Failure Review for Claude Code. It runs in Claude Code inside the Claude app, so it feels like any chat you already use.
Failure Review for Claude Code
Connected to your own database
Which failures need review and follow-up?
code | analysis | mode | severity | action_priority | rpn | reviewed | open_actions | current_controls --------|-----------|-----------------------|----------|-----------------|-----|----------|--------------|----------------- PACK-01 | DEMO-PACK | Wrong label | | | | false | 1 | 0 FILL-02 | DEMO-FILL | Loose lid | 9 | M | 54 | false | 1 | 0 FILL-01 | DEMO-FILL | Underfilled container | 8 | H | 192 | true | 1 | 1
Ask it anything
Ten questions your review desk answers
These run against the working demo. They show the joins and local checks in your version, without claiming that PQ-FMEA+ cannot make similar reports.
Switching
How to switch from PQ-FMEA+
The move involves exporting your FMEA sheet, mapping its columns, testing the import and reconciling the records before you rely on the new database.
- 1
Export your FMEA sheet
Export the FMEA sheet from PQ-FMEA+ as an XLSX workbook. Include the failure records and any fields you need to keep for review, such as ratings, priorities and action details. PQ-FMEA+ documents native XLSX export, but check with PQ-FMEA+ if you are unsure which export options your account allows. Keep the original workbook so you can compare it with the imported records.
- 2
Map and test the import
Map the columns in your workbook to the fields in Failure Review, then run the import in test mode before loading records for everyday use. The test lets you check how the mapping handles your data without treating the import as ready for use. Do not assume that every PQ-FMEA+ field has a direct match. Resolve unclear mappings with your engineers before proceeding.
- 3
Reconcile flagged records
Review the import results and check every failure row against the workbook. The import retains unmapped source values, and imported priorities are marked unreviewed. A malformed row stops the whole import, so correct the source or mapping and test again. Confirm ratings, priorities and action details with the people responsible for them. Treat action information from the source as evidence to review, not as an approved current action.
- 4
Run both systems briefly
Keep PQ-FMEA+ available while your team uses Failure Review for a short period. Compare the records and working papers used in your normal review work, and ask engineers to check that important history and current actions are represented as expected. Resolve differences before relying on the new database. Historical approvals, diagrams and action assignments may need separate mapping or review, so do not assume they transferred with the failure rows.
- 5
Switch off PQ-FMEA+
Once your team has checked the imported records and agreed that the new setup supports its review work, stop using PQ-FMEA+ for current records. Keep the original workbook and any other records you need to retain under your normal business practices. Confirm that the database and its backups are being managed appropriately before you rely on it as the working record.
Where the real effort goes
The main effort is usually mapping your own fields and review rules, then deciding which history to bring across. Failure rows can be imported from the workbook, but historical approvals, diagrams, action assignments and custom rating definitions need separate mapping or review. Validate the mapping against an actual export. If Enterprise DNA installs and runs your version, it handles this mapping and import work with you.
Not ready for a call?
Get your PQ-FMEA+ switch plan by email
We will send you the step-by-step plan for moving your business off PQ-FMEA+, what the move really involves, and how we would do it for you.
Sent. Check your inbox.
Your PQ-FMEA+ switch plan is on its way.
Rather talk it through? Book a call arrow_forwardThree ways to own it
Start with the free base or have your version built
Open source
Do it yourself
Free, open source
- 1 Clone the repo and run npm install, npm test and npm run demo
- 2 Open it in Claude Code, Codex, OpenCode or Cursor
- 3 Map your PQ-FMEA+ XLSX export and run import pq-fmea with --dry-run before importing
- 4 Review the records and set up controlled access and backups for shared use
Built around your business
We customise it
One setup fee, then a retainer for ongoing work
- check Your failure fields, scoring references and review rules
- check Your PQ-FMEA+ export mapped and reconciled with engineering
- check Your control-plan documents and customer requirements
- check A web front end or a different stack where your team needs one
Omni by Enterprise DNA
We run it for you
One setup fee, then a retainer
- check Installed with controlled access and backups
- check Your weekly review and action working papers prepared
- check Kept working as processes and requirements change
- check Run through Omni by Enterprise DNA beside the rest of your business
Questions
Instead of PQ-FMEA+, answered
Is this a complete PQ-FMEA+ replacement? expand_more
The free base covers failure records, recorded ratings and priorities, action evidence, control links and working documents. Enterprise DNA scopes the diagrams, specialised forms, screens and integrations your version needs. Check that scope with your engineers before changing the software they rely on.
Will it certify our analysis or decide that a process is safe? expand_more
No. It checks whether review records and evidence are complete and current. Engineers supply the rating method, priority and acceptance decisions. A multiplied risk score is shown for context and never decides whether a risk is acceptable.
Can we bring our PQ-FMEA+ history across? expand_more
PQ-FMEA+ exports its analysis to a workbook. We map its columns, do a test run and reconcile the rows with you. The free base keeps the source workbook and row values. It has been tested with a synthetic workbook, so your actual export needs validation. Historical approvals, diagrams and action assignments need separate mapping or review.
What does PQ-FMEA+ cost compared with this? expand_more
Its published subscription is €837 net per month on a twelve-month commitment, or €10,044 net for the year. Annual payment is €7,536 net, and perpetual licences are also offered. The price list was checked on 12 November 2026. The free base has no licence charge. Enterprise DNA agrees one setup fee, then a retainer to customise and run your version.
What happens when a failure or control changes? expand_more
A failure edit keeps the earlier evidence but marks the previous review and control links as out of date. Completion evidence tied to an older version is flagged too. Your team reviews the change and records fresh evidence before relying on it.
Bring the licence and one real analysis
In a 30-minute call with Sam, compare your PQ-FMEA+ agreement with the review work you want to own. We can map the first analysis, agree your version and explain the setup fee and ongoing retainer.
Failure Review for Claude Code is free and open source, published by Enterprise DNA.
Done paying for PQ-FMEA+?
Get your version built