Instead of Accruent Space Intelligence
Stop renting Accruent Space Intelligence. Own your workplace planning system.
We build your version around your offices, attendance assumptions and move approvals. Bring your building register across, agree the remaining migration, and let us run the system for you.
Accruent lists Basic at US$10,000 a year and Advanced at US$30,000 a year, plus headcount costs. Your final quote depends on the tier.
- check_circleYour data in a database you own
- check_circleOpen source, no lock-in
- check_circleBuilt and run by Enterprise DNA
What the subscription covers
Space planning priced by the package and headcount
Accruent Space Intelligence combines workplace data and scenario planning. Compare the parts your team uses with a planning desk built around your own records and decision process.
A yearly base charge
Basic is listed at US$10,000 a year before headcount costs. Use your actual renewal quote when comparing the scope.
Headcount costs on top
The vendor adds headcount costs to the base package. The listed base is not the complete bill for an organisation.
Scenario planning in Advanced
Advanced is listed at US$30,000 a year plus headcount costs, with allocations, restacking and scenario comparison.
Connections across workplace systems
The product combines data from systems such as EMS, FAMIS and Lucernex. Identify the connections your business actually needs.
Maps and visual planning
Indoor mapping and floor-level scenarios are part of the Advanced offer. We scope the views your planners need in your version.
Your process decides the replacement
Bring a recent move proposal, its review pack and your renewal quote. Those define the work your version must handle.
Your records, your planning rules
A weekly review that joins capacity, evidence and move tasks
Footprint
Know which proposal fits the recorded capacity
Keep buildings, floors and department headcounts together. Compare assigned seats with the peak attendance assumption before approving a move.
- check Current people and seats by floor
- check Scenario differences beside today’s footprint
- check Floor overages and missing headcount assignments
- check Checks that combine capacity evidence with the departments affected
Attendance
Separate observed use from an assumption
Keep actual counts, their dates and their evidence. A floor with no recent sample stays unknown rather than looking empty.
- check Recent sample counts alongside average attendance
- check Peak observed attendance against recorded capacity
- check Offices needing a fresh count
- check Explicit peak assumptions for each department
Moves
Make the decision and its blockers visible
Each scenario has an owner, deadline and move checklist. A human records approval only after the checks pass.
- check Overdue tasks grouped by accountable owner
- check Named completion evidence for blocking work
- check Changed inputs require a fresh approval
- check The former footprint remains in the planning history
Review packs
Produce the paperwork from the records
Prepare a move brief, capacity record and weekly review in your business brand. Your planner checks the evidence and makes the decision.
- check Proposed allocation and unresolved checks together
- check Emergency-plan references and review dates
- check Read-only views for the Monday meeting
- check Your own fields, questions and review rules
Make it yours
Design your own Accruent Space Intelligence replacement
Everything starts from the open-source base. Then it gets your name, the parts you run, your rules and your data from Accruent Space Intelligence. Try it here, and we build the real one.
2. What it runs
3. Make it fit
4. Your colour
Answered from your own database
Good morning. Here is what needs you today.
We build it from the open-source base, bring your Accruent Space Intelligence data across and run it for you.
What it looks like
Ask it like you would ask a colleague
Real answers from the demo data that ships with Space Planning for Claude Code. It runs in Claude Code inside the Claude app, so it feels like any chat you already use.
Space Planning for Claude Code
Connected to your own database
How many people and seats are assigned to each floor?
Current footprint
- Building
- Harbour Office
- Floor
- Harbour Level 1
- People
- 20
- Seats
- 20
- Capacity
- 24
- Spare_seats
- 4
- Required_seats
- 16
Current footprint
- Building
- Harbour Office
- Floor
- Harbour Level 2
- People
- 10
- Seats
- 12
- Capacity
- 20
- Spare_seats
- 8
- Required_seats
- 10
Current footprint
- Building
- Hill Office
- Floor
- Hill Ground
- People
- 8
- Seats
- 8
- Capacity
- 12
- Spare_seats
- 4
- Required_seats
- 6
| Plan | Building | Floor | People | Seats | Capacity | Spare_seats | Required_seats |
|---|---|---|---|---|---|---|---|
| Current footprint | Harbour Office | Harbour Level 1 | 20 | 20 | 24 | 4 | 16 |
| Current footprint | Harbour Office | Harbour Level 2 | 10 | 12 | 20 | 8 | 10 |
| Current footprint | Hill Office | Hill Ground | 8 | 8 | 12 | 4 | 6 |
Ask it anything
Questions across your space and move records
Each question runs on the fictional demo. These show the analysis you can own and adapt, without assuming what a configured vendor report can answer.
Switching
How to switch from Accruent Space Intelligence
A move involves exporting the Facilities building register, testing its import, then reconciling floors, allocation scenarios and any history or evidence you choose to bring.
- 1
Export the building register
Use Accruent’s documented CSV export from Facilities to export the building register. If that export is not available in your account, or you need records beyond the building register, check with Accruent about what your account allows. Do not treat the building export as a complete migration: floors, allocation scenarios and other records need separate reconciliation.
- 2
Preview the import
Ask whoever is setting up the database to run the import preview first. It validates the full batch without saving, accepts mapped column labels, and preserves the original CSV, raw fields and source identity. Review the preview before loading records for real.
- 3
Review import findings
Review the import’s validation findings and any rows it will not accept, including changed source rows that need reconciliation. Confirm building names and fields against the export, then reconcile floors, allocation scenarios, drawings, sensor history and approval evidence separately if you choose to bring them. Keep a list of unresolved gaps.
- 4
Run both side by side
Keep Accruent and the new database in use side by side for a short period. Have planners compare the records and outputs they rely on, including current building details and any reconciled floor or allocation data. Check discrepancies with the people who own those records, and settle them before treating the new database as the working record.
- 5
Switch off Accruent
After the side-by-side check, set the new database as the place planners maintain space records, then end Accruent access or service according to your agreement. Before closing the account, confirm with Accruent whether you need to retain access to source exports or other records not migrated. Keep the migration scope and unresolved exclusions documented.
Where the real effort goes
The building register is the straightforward starting point. The real work is matching your field names and local capacity rules, then reconciling floors, allocation scenarios, drawings, sensor history and approval evidence you decide to bring. Agree what history to migrate before switching. If Enterprise DNA installs and runs the system, they handle this migration work with you.
Not ready for a call?
Get your Accruent Space Intelligence switch plan by email
We will send you the step-by-step plan for moving your business off Accruent Space Intelligence, what the move really involves, and how we would do it for you.
Sent. Check your inbox.
Your Accruent Space Intelligence switch plan is on its way.
Rather talk it through? Book a call arrow_forwardThree ways to own it
Choose who builds and operates your version
Open source
Do it yourself
Free open-source code
- 1 Clone the repo and install its dependencies.
- 2 Run npm test and npm run demo.
- 3 Use Claude Code, Codex, OpenCode or Cursor.
- 4 Preview your ASI building CSV, map headers as needed and reconcile the remaining records.
Built around your business
We customise it
A scoped setup fee, then a retainer for ongoing work
- check Your buildings, attendance assumptions and approval rules
- check Your building export mapped and the remaining migration agreed
- check A web view, floor-planning screen or different technology where needed
- check Your decision packs tested with the people who use them
Omni by Enterprise DNA
We run it for you
One setup fee, then a monthly retainer
- check Installed and operated through Omni by Enterprise DNA
- check Your business connections, access and backups set up
- check Your review packs and changes looked after
- check A managed workplace planning system shaped around your team
Questions
Instead of Accruent Space Intelligence, answered
What does Accruent Space Intelligence cost? expand_more
Accruent lists Basic at US$10,000 a year and Advanced at US$30,000 a year, both plus headcount costs. The vendor says pricing varies by tier. Bring your renewal quote so the comparison uses your actual scope.
Can we bring our existing records across? expand_more
The free version imports the building register from the documented Facilities CSV export. It keeps the original source and supports different column labels. Floors, allocation scenarios, drawings, sensor history and approval evidence need separate reconciliation. We agree that migration with you before switching.
Can our planners still use maps or live attendance feeds? expand_more
We scope floor-planning screens, mobile access and live connections into your version where they matter. The free base gives a planner a records desk with read-only views and manually recorded attendance counts. Your workflow determines the extra work.
Does a passing check mean a move is safe? expand_more
No. The checks surface missing evidence, capacity conflicts and unfinished tasks. A competent person assesses the actual workplace and records the decision. Emergency-plan references and review dates support that process. They do not certify a building or replace a safety assessment.
Who owns it, and what does Enterprise DNA charge? expand_more
You own the database and can export the records. The code is free and open source, with hosting and operating costs depending on your setup. Enterprise DNA scopes a setup fee, then a retainer for customisation and ongoing operation. The first call establishes what your version needs.
Bring one move proposal and your renewal quote
Spend 30 minutes with Sam. Show the floors involved, the questions your team asks and the approvals you need. We will map the version worth building for your business.
Space Planning for Claude Code is free and open source, published by Enterprise DNA.
Done paying for Accruent Space Intelligence?
Get your version built