Instead of Intelex
Stop renting Intelex. Own your management of change system.
We build your version around how your sites control change, bring your Intelex change history across and run it for you. Start with your sign-off rules and the changes in operation today.
Intelex lists its entry Safety Essentials plan from US$44 per user a month, with a 25-user minimum billed annually. Management of Change is not in that plan, and the plans that cover it are quoted privately.
- check_circleYour data in a database you own
- check_circleOpen source, no lock-in
- check_circleBuilt and run by Enterprise DNA
The recurring bill
What your Intelex agreement pays for
Intelex publishes one price, for its entry safety plan. Management of change sits in the Advanced and Enterprise plans, which are quoted. Here is what that bill buys, set against owning the records yourself.
A whole platform for one workflow
Change control is one application on a platform that also covers incidents, environment, quality and sustainability. It is not in the entry plan, so a site that wants it is quoted for a plan across that wider platform.
A login for everyone who signs
The entry plan is priced per user with a 25-user minimum. Every engineer, supervisor and manager who reviews or signs a change needs a seat.
Configured forms and workflows
Intelex describes its Advanced plan as services-assisted. Your change form, stages and checklists are set up with that help, on a platform you rent.
Dashboards someone else designed
Reporting depth rises with the plan, from pre-defined dashboards to tailored reports. The questions you can ask depend on what has been built.
The phone app
Intelex lists its iOS and Android app with the Advanced plan. Its Essentials help pages say the mobile app is not supported on Essentials.
Documents and training as add-ons
On the entry plan, document control and training management are add-ons. A change is not finished until its procedures are updated and its people trained.
Your change control
The site change meeting, run from your own records
Before the change
No sign-off without the thinking behind it
Every change carries its technical basis, its effect on safety and health, and the review that tested it.
- check Risk level decides which roles must sign
- check Medium and high risk changes need a recorded risk review before anyone signs
- check Flag changes that touch procedures, drawings or the safety case
- check A rejection is kept; a sign-off is never overwritten
Start-up
Nothing goes live with a gap open
Start-up is refused until every gate passes, and the reason is listed in plain words.
- check All sign-offs in, none rejected
- check Training, procedure updates and checks done with evidence
- check Pre-start-up safety review recorded by name and date
- check At a major hazard site, the regulator notice recorded first
Temporary and emergency
Bypasses that cannot quietly become permanent
Temporary changes carry an expiry from the day they are raised. Emergency repairs go live first and collect their sign-offs after.
- check Expired temporary changes top the weekly list
- check Every extension needs a reason, and repeat extensions are flagged
- check Emergency repairs missing sign-offs after a week are flagged
- check Close-out records whether the plant was put back or the change made permanent
Your records
Answers your current dashboard was never built for
Ask in plain words and get the answer from your own change history, with the rule behind every flag.
- check Days from request to start-up, by site and risk
- check Who holds the most overdue change actions
- check A branded change record and pre-start-up certificate for every change
- check Every finding tied to the New Zealand or Australian rule it comes from
Make it yours
Design your own Intelex replacement
Everything starts from the open-source base. Then it gets your name, the parts you run, your rules and your data from Intelex. Try it here, and we build the real one.
2. What it runs
3. Make it fit
4. Your colour
Answered from your own database
Good morning. Here is what needs you today.
We build it from the open-source base, bring your Intelex data across and run it for you.
What it looks like
Ask it like you would ask a colleague
Real answers from the demo data that ships with Management of Change for Claude Code. It runs in Claude Code inside the Claude app, so it feels like any chat you already use.
Management of Change for Claude Code
Connected to your own database
What needs attention on our plant changes this week?
MOC-0004
- Site
- AKL
- Title
- Raise working inventory of tank T-104 from 40...
- Owner
- Aroha Ngata
- Rule
- safety case change not notified
- Detail
- major hazard site, status approved
- Days
- 35
MOC-0006
- Site
- GEE
- Title
- Engineered clamp on leaking steam line SL-7
- Owner
- Sam Okafor
- Rule
- emergency change without approvals
- Detail
- missing safety, site_manager
- Days
- 12
MOC-0005
- Site
- GEE
- Title
- Change CIP caustic dosing logic in PLC-3
- Owner
- Sam Okafor
- Rule
- started up with pre-start-up actions open
- Detail
- 1 open: A-010
- Days
- 10
MOC-0002
- Site
- HB
- Title
- Temporary bypass of high-level switch LSH-12 ...
- Owner
- Hemi Walker
- Rule
- temporary change past expiry
- Detail
- expired 2026-10-30, still in place
- Days
- 5
MOC-0003
- Site
- AKL
- Title
- Change caustic soda supply from 50 percent to...
- Owner
- Aroha Ngata
- Rule
- waiting on approval
- Detail
- missing safety
- Days
- 25
MOC-0001
- Site
- AKL
- Title
- Replace solvent transfer pump P-201 with a se...
- Owner
- Aroha Ngata
- Rule
- action overdue
- Detail
- A-004 drawing: Update P&ID 201 to show the ne...
- Days
- 20
MOC-0007
- Site
- HB
- Title
- Hire compressor during overhaul of screw comp...
- Owner
- Hemi Walker
- Rule
- temporary change expiring
- Detail
- expires 2026-11-13
- Days
- 9
MOC-0002
- Site
- HB
- Title
- Temporary bypass of high-level switch LSH-12 ...
- Owner
- Hemi Walker
- Rule
- action overdue
- Detail
- A-006 inspection: Fit the replacement LSH-12 ...
- Days
- 5
MOC-0001
- Site
- AKL
- Title
- Replace solvent transfer pump P-201 with a se...
- Owner
- Aroha Ngata
- Rule
- close-out overdue
- Detail
- in operation since 2026-09-20
- Days
- 45
MOC-0008
- Site
- GEE
- Title
- Reduce night shift on line 2 from three opera...
- Owner
- Tom Burke
- Rule
- draft gone quiet
- Detail
- raised 2026-09-25, not sent for review
- Days
- 40
| Code | Site | Title | Owner | Rule | Detail | Days |
|---|---|---|---|---|---|---|
| MOC-0004 | AKL | Raise working inventory of tank T-104 from 40... | Aroha Ngata | safety case change not notified | major hazard site, status approved | 35 |
| MOC-0006 | GEE | Engineered clamp on leaking steam line SL-7 | Sam Okafor | emergency change without approvals | missing safety, site_manager | 12 |
| MOC-0005 | GEE | Change CIP caustic dosing logic in PLC-3 | Sam Okafor | started up with pre-start-up actions open | 1 open: A-010 | 10 |
| MOC-0002 | HB | Temporary bypass of high-level switch LSH-12 ... | Hemi Walker | temporary change past expiry | expired 2026-10-30, still in place | 5 |
| MOC-0003 | AKL | Change caustic soda supply from 50 percent to... | Aroha Ngata | waiting on approval | missing safety | 25 |
| MOC-0001 | AKL | Replace solvent transfer pump P-201 with a se... | Aroha Ngata | action overdue | A-004 drawing: Update P&ID 201 to show the ne... | 20 |
| MOC-0007 | HB | Hire compressor during overhaul of screw comp... | Hemi Walker | temporary change expiring | expires 2026-11-13 | 9 |
| MOC-0002 | HB | Temporary bypass of high-level switch LSH-12 ... | Hemi Walker | action overdue | A-006 inspection: Fit the replacement LSH-12 ... | 5 |
| MOC-0001 | AKL | Replace solvent transfer pump P-201 with a se... | Aroha Ngata | close-out overdue | in operation since 2026-09-20 | 45 |
| MOC-0008 | GEE | Reduce night shift on line 2 from three opera... | Tom Burke | draft gone quiet | raised 2026-09-25, not sent for review | 40 |
Ask it anything
Ten questions your change records answer
These run against the working demonstration today. Your own version asks them of your sites, your sign-off rules and your history.
Switching
How to switch from Intelex
The move involves exporting your change requests and actions, mapping your records, checking the import, and running both systems side by side before you switch.
- 1
Export changes and actions
Export your Management of Change report view and its actions from Intelex. The migration path uses a CSV export of change requests and actions. What you can export may depend on your account and site setup, so check with Intelex if you cannot find those reports. Sign-offs, risk review worksheets and attachments do not come across in a simple CSV export, so identify what you need to retain separately.
- 2
Prepare the new records
Set up your sites in the new system before loading the records. Then use its import process to bring in the exported change requests and actions. Start with a test run rather than loading the records for real straight away. The test shows what the importer can match from your export without committing the import, giving you a chance to review the results first.
- 3
Review the import findings
Check the test results, including the counts and any fields or records the importer could not match. Intelex forms vary by configuration, so the importer reports mismatches instead of guessing. Review the flagged items against your source records and decide how to handle them. When you are satisfied with the mapping and findings, run the import for real.
- 4
Run both systems briefly
Keep Intelex available while your team checks the imported records against current change work. Confirm that people can find the changes and actions they need, and agree which system is the source of truth during this period. The two systems do not automatically stay in sync, so make a clear plan for recording new changes and updates while both are in use.
- 5
Switch off Intelex
Before stopping Intelex, reconcile the records created or updated during the side-by-side period and confirm that the information you need is retained. Make sure you have separately kept any sign-offs, review worksheets or attachments that were not included in the CSV import. Once your team is ready to work in the new system, stop using Intelex for change control.
Where the real effort goes
The main work is usually mapping your Intelex fields and rules to the new records, then deciding how much history to bring across. The importer handles change requests and actions from a spreadsheet export, but it does not bring across sign-offs, risk review worksheets or attachments in a simple CSV. If Enterprise DNA installs and runs it for you, they handle this mapping as part of the migration.
Not ready for a call?
Get your Intelex switch plan by email
We will send you the step-by-step plan for moving your business off Intelex, what the move really involves, and how we would do it for you.
Sent. Check your inbox.
Your Intelex switch plan is on its way.
Rather talk it through? Book a call arrow_forwardThree ways to own it
Choose how much you want us to handle
Open source
Do it yourself
Free, open source
- 1 Clone the repo and run npm install, npm test and npm run demo
- 2 Open it in Claude Code, Codex, OpenCode or Cursor and ask what needs attention
- 3 Set up your sites and sign-off rules, then test your Intelex export with a dry run
- 4 Put your logo on the change records and pre-start-up certificates in brand.json
Built around your business
We customise it
One setup fee, then a retainer for ongoing work
- check Your change types, risk matrix, sign-off roles and stages
- check Your Intelex change history mapped and checked, sign-offs and attachments included
- check A phone form for the plant floor or a web front end if your team wants one
- check Links to your maintenance, document and training systems
Omni by Enterprise DNA
We run it for you
One setup fee, then a retainer
- check Installed with access, backups and ownership agreed
- check The weekly change review prepared for your site meeting
- check Expiring bypasses and overdue actions chased before they become findings
- check Run through Omni by Enterprise DNA beside the rest of your business
Questions
Instead of Intelex, answered
What does Intelex cost compared with this? expand_more
Intelex lists its entry Safety Essentials plan from US$44 per user a month with a 25-user minimum, billed annually, and management of change is not in that plan. The plans that include it are quoted privately, so bring your agreement. The free version has no licence fee; hosting and your agent subscription are separate. Enterprise DNA builds and runs your version for one setup fee, then a retainer.
Can you bring our Intelex change history across? expand_more
Yes. The free version reads a spreadsheet export of your change requests and their actions, reports anything it cannot match, and does a test run first. Intelex forms are set up differently at every site, and sign-offs, review worksheets and attachments do not come out in a simple export. Mapping those is part of what we do for an installed version.
Does this meet our obligations as a major hazard facility? expand_more
It records what the rules expect a change process to show: the technical basis, the effect on safety, the review, the sign-offs, training before start-up, updated procedures and the regulator notice. Each check cites the New Zealand or Australian regulation it comes from. It supports your own review; it does not certify compliance or decide whether a change needs a notice.
Our operators and supervisors are not going to use a chat window. What then? expand_more
They do not have to. The change records and the weekly list print in your brand, and the same records can sit behind a simple phone form or a screen in the control room. We build that into your version where your team needs it, on the database you own.
What do we keep if we stop working with you? expand_more
Everything. The database, your version and the full change history, sign-offs and activity log included, are yours. A complete snapshot exports in one step, and we agree access, backups and recovery with you when it is set up.
Bring your change register and your Intelex bill
Spend 30 minutes with Sam. We will look at how your sites control change today, the temporary changes you have in place, and what your own version should do first.
Management of Change for Claude Code is free and open source, published by Enterprise DNA.
Done paying for Intelex?
Get your version built