Instead of Veryon
Stop renting Veryon. Own your maintenance tracking.
We build your version around your fleet, your maintenance programme and the way your engineers release work, bring your Veryon due lists across and run it for you. Your pilots keep filling in the tech log the way they do now.
Veryon charges an annual subscription for every aircraft on the system, with the cost varying by make and model, plus a one-time enrollment fee. The price is quoted privately.
- check_circleYour data in a database you own
- check_circleOpen source, no lock-in
- check_circleBuilt and run by Enterprise DNA
What the subscription covers
You pay every year, for every tail, for screens over your own records
Veryon does not publish a price. It says how the bill is built, and most of it is the layer over records you already own.
A subscription for every aircraft
Veryon charges an annual subscription for each aircraft you manage on the system, and the cost varies by make and model. A new helicopter is a new line on the bill.
A fee to get started
There is a one-time enrollment fee for an onboarding analyst to gather and migrate your data and review your maintenance tracking before you use it.
Analysts to keep your register
Veryon's analysts apply relevant directives and service bulletins weekly. You pay for someone else to keep the register of your own aircraft.
More modules for helicopter work
For helicopter operators, fleet management, MRO management, inventory and business support are grouped under Veryon Tracking+, a separate product from the tracking itself.
A price you only get by asking
There is no price list. Veryon asks you to get a quote to understand its pricing, so you cannot compare the bill without a sales call.
Your history in someone else's system
Every hour, inspection, directive and release your engineers have recorded lives inside the vendor's software, and leaving means asking for it back.
Your own maintenance control
Start with what the maintenance controller and the chief pilot ask every morning
Airworthiness
Answer "can it fly?" before the pilot asks
Every reason an aircraft should stay on the ground, from the records, in one answer per aircraft.
- check Overdue inspections, expired deferrals and parts past their life limit, by aircraft
- check A tech log entry that warns when it takes the aircraft past an item
- check Work done on a work order but not yet released to service
- check Open defects on aircraft that have flown since they were raised
Due list
Know what is due on every aircraft, by hours, cycles and days
The last time each item was done plus its interval, against the hours and cycles the tech log says the aircraft has today.
- check Whichever comes first of hours, cycles or calendar days
- check A date for each item at the rate that aircraft is actually flying
- check A work pack for the next downtime, so the aircraft is on the ground once
- check Reviews of airworthiness flagged 30 days out so they can be booked
Directives and parts
Keep the directive register and life-limited parts straight
Every directive against every aircraft of its type, and every tracked part with its own hours and cycles since new.
- check Hours flown since a directive took effect, counted against its window
- check Recurring directives on the due list with the inspections
- check Parts that keep their own hours and cycles when moved to another aircraft
- check Parts fitted with no release certificate on file
Releases and paperwork
Releases that refuse what they should
Nine checks against the rules an operator maintains its aircraft under, and the documents owners and auditors ask for.
- check A release refused with a task open, a lapsed licence or no rating for the type
- check A review of airworthiness refused without an inspection authorisation
- check A branded monthly maintenance status report for each aircraft owner
- check Work orders and directive compliance records ready to print
Make it yours
Design your own Veryon replacement
Everything starts from the open-source base. Then it gets your name, the parts you run, your rules and your data from Veryon. Try it here, and we build the real one.
2. What it runs
3. Make it fit
4. Your colour
Answered from your own database
Good morning. Here is what needs you today.
We build it from the open-source base, bring your Veryon data across and run it for you.
What it looks like
Ask it like you would ask a colleague
Real answers from fictional demo records for a Queenstown helicopter and charter operator. Your engineers ask the question and check the records behind the answer.
Aircraft Maintenance for Claude Code
Connected to your own database
Which aircraft can fly today, and what is stopping the others?
ZK-SLA Airbus AS350 B3: NOT SERVICEABLE
8437.1 hours, 21579 cycles STOP DCA/AS350/906 not assessed, past its compliance window STOP D-0031 open defect: Starter generator slow to engage on second start STOP WO-0412 has work done and not released to service soon DCA/AS350/905 due in 12.0 h
ZK-SLB Airbus AS350 B2: NOT SERVICEABLE
12900.7 hours, 31028 cycles STOP 100HR 100 hour inspection overdue (3.4 h over) STOP Tail rotor blade TR-4471 past its life limit (2.3 h over)
ZK-SLC Cessna 208B Grand Caravan: NOT SERVICEABLE
6246.7 hours, 7549 cycles STOP D-0027 deferral expired 2026-10-20 (MEL 30-1 (10 days)) soon Review of airworthiness due 2026-11-05: book it
ZK-SLR Robinson R44 Raven II: SERVICEABLE
1942.5 hours, 6175 cycles Nothing due inside the planning window.
Ask it anything
Questions answered from your maintenance records
Real questions the free version answers today on its demo data. They are not a claim that Veryon cannot produce a custom report.
Switching
How to switch from Veryon
A move involves exporting each aircraft’s Veryon due list, mapping it into the new database, checking the results, and running both systems side by side before you switch.
- 1
Export each due list
Use the export available in Veryon to save the due list for each aircraft as a CSV. The migration path is built around those due lists, not an automatic transfer of every record in your account. If you cannot find or produce a due-list CSV, check with Veryon about what your account can export before you plan the move.
- 2
Load the due lists
Set up your aircraft, engineers and components, then load the CSV due lists into the new database. Start with the test run, which shows what will come across before anything is saved. Review its report for items that need mapping. Then run the import to save programme items, including their intervals and when they were last done. Running the import twice does not duplicate items.
- 3
Check the imported records
Compare the imported due list against your last Veryon due list, line by line. Report layouts vary, so check any items the test run identifies for mapping and resolve differences before relying on the result. Directives come onto the register, but each aircraft’s directive assessment needs to be re-recorded by your engineer.
- 4
Run both side by side
Keep Veryon available while you run the new system alongside it for a short period. Compare the due lists and check that aircraft, intervals and last-done points match your Veryon records. Have your maintenance team review the directive register and assessments too. Resolve differences before making the new system your source for day-to-day tracking.
- 5
Switch off Veryon
Once you have checked the records and your team is ready to use the new system, stop using Veryon for day-to-day tracking. Confirm that your engineer has recorded each aircraft’s directive assessment, since those assessments do not come across with the directive register. Contact Veryon about ending your account under your agreement.
Where the real effort goes
The main work is usually mapping your own report fields and rules, then deciding how much history to bring across. The available import covers each aircraft’s due list, including programme intervals and last-done points, rather than every record in your account. Your engineer re-records directive assessments. When Enterprise DNA runs the system for you, it maps your report and checks the result against your last Veryon due list line by line.
Not ready for a call?
Get your Veryon switch plan by email
We will send you the step-by-step plan for moving your business off Veryon, what the move really involves, and how we would do it for you.
Sent. Check your inbox.
Your Veryon switch plan is on its way.
Rather talk it through? Book a call arrow_forwardThree ways to make it yours
Start with the free version or have your version built
Open source
Do it yourself
Free code
- 1 Clone the repo and run npm install, npm test and npm run demo.
- 2 Open it in Claude Code, Codex, OpenCode or Cursor.
- 3 Enter your aircraft, engineers and tracked parts by asking for them.
- 4 Export each aircraft's due list from Veryon to CSV and run the import with --dry-run first.
Built around your business
We customise it
One setup fee, then a retainer
- check Your maintenance programme, intervals, tolerances and MEL items
- check Your Veryon due lists and component records brought across and checked line by line
- check A phone tech log for pilots that works with no signal, if your crews want one
- check Directive register upkeep, or a connection to your accounts, scoped for how you work
Omni by Enterprise DNA
We run it for you
One setup fee, then a retainer
- check Installed and operated through Omni by Enterprise DNA
- check Access for engineers, the chief pilot and the office
- check Backups, restore checks and updates looked after
- check The Monday review and the owners' monthly reports prepared for you to approve
Questions
Instead of Veryon, answered
Our pilots fill in the tech log on paper or in an app. What happens to that? expand_more
In the free version the office enters the day's flying from a photo of the tech log page, a text or a spreadsheet, by asking. Nothing is guessed: if a figure is unclear, it asks. Each entry says straight away if it takes the aircraft past an item that is due. If your pilots want a phone tech log that works with no signal, we build that into your version.
How does our maintenance programme come across from Veryon? expand_more
Each aircraft's due list, saved as a spreadsheet, comes in as programme items with their intervals and when they were last done, and directives go onto the register. A test run shows what will come across before anything is saved, and running it twice does not double anything. Report layouts vary, so on the paid paths we map yours and check the result against your last Veryon due list line by line. Each aircraft's directive assessments are re-recorded by your engineer.
Veryon's analysts apply new directives for us. Who does that here? expand_more
Your engineer reads the directive and records whether it applies to each aircraft. The system then counts the hours each aircraft flies against the compliance window and puts recurring directives on the due list. If you would rather not do the register yourself, keeping it up to date is part of what we do when we run it for you.
Does this replace our engineers or our approved programme? expand_more
No. It checks your records against nine rules, from directives and life limits to the review of airworthiness and releases to service, and names the source of each. Your engineers still make the airworthiness call and sign the release, and your programme and exposition still set the rules. It makes sure the evidence is there when an auditor or an owner asks.
What do we pay Enterprise DNA? expand_more
The code is free. A version built and run for your business has one setup fee, then a retainer. Sam looks at your Veryon bill, your fleet and how your engineers work before agreeing the scope.
Own the records behind every release to service
Take 30 minutes with Sam to go through your Veryon bill, your fleet and how work moves from the tech log to the release. We map your programme and agree what your version needs before you change anything.
Aircraft Maintenance for Claude Code is free and open source, published by Enterprise DNA.
Done paying for Veryon?
Get your version built